Shearing, cutting, sawing, welding

Blanks and workpieces are altered in many production processes. Intermediate steps such as shearing, cutting and sawing are embedded in processes which are crucial for the subsequent processing stages. Reliable processes can only be guaranteed if standards are adhered to. KERN Industrie Automation can already show a wide range of references through a number of already installed plants.

References:

Shear 6 ThyssenKrupp Rasselstein Germany
  • Replacement of the existing CP550 system with SIMATIC S7-400 with 448 digital inputs and 448 outputs in 24VDC and 60 VDC technology
  • Visualization with MP370/WinCC Flexible
  • Time for rebuilding: 2 days
Dissecting plant ZA 9 ThyssenKrupp Rasselstein, Germany
  • Modernization of the electrical engineering in combination with the renewal of the shear
  • Time for rebuilding: 4 weeks (plant in halt)
Dissecting plant ZA 11 ThyssenKrupp Rasselstein, Germany
  • Modernization of the electrical engineering in combination with the renewal of the sort-out process
  • Time for rebuilding: 5 days (plant in halt for repair)

 

Panel saw 1 + 2 Aleris Koblenz, Germany
  • Complete renewal of the control technology with SIMATIC S7 and drive technology with SINAMIC S for a total of 8 axes per sawing gantry
  • Time for rebuilding: 8 days (plant in halt during Christmas period)
Plate saw Aleris Koblenz, Germany
  • Complete technical equipment
Billet saw Aleris Koblenz, Germany
  • Complete renewal of the control technology with Simatic S7
  • Time for rebuilding: 5 days (plant in halt during Christmas period)
Welding machine grafting plant VA10 Thyssenkrupp Rasselstein, Germany
  • Modernization of electrical engineering
  • Replacement of the existing automation system (S5) with a SIMATIC S7-300F
  • Visualization with WinCC
  • Management/visualization of welding parameters in a SQL-Database
  • Implementation of new drive technology with Sinamics S120 connected to servo motors
  • Renewal of the pneumatic control devices
  • Renewal of the welding current engineering with a welding processo
  • Time for rebuilding: 5 days
  • Our range of services
    • Strip processing lines
    • Process engineering plants
    • Secondary metallurgy
    • Wire pickling lines
    • Rolling mill plants
    • Safety engineering
    • Testing plants
    • Shearing, cutting, sawing, welding
    • Waste water and municipal plants
Previous post Rolling mill plants Next post Testing plants
white

KERN Industrie Automation
GmbH & Co.KG
Bergstraße 63a
56203 Höhr-Grenzhausen

Tel.: +49 26 24 / 94 71 2-0
Fax: +49 26 24 / 94 71 2-99
E-Mail: info@K-I-A.de

  • Home
  • Terms & Conditions
  • Data protection
  • Legal notice
  • Fernwartung
© 2015 Tabula rasa